If it must enter from the front or side of the house, the basic layout remains the same but additional lengths of soil pipe will be required. In the layout shown here, it enters from the back of the house, which, of course, is an ideal arrangement because a minimum amount of soil pipe will be required.
![plumbing floor plan water cad plumbing floor plan water cad](https://thumb.cadbull.com/img/product_img/large/Pipe-plan-and-section-detail-dwg-file-Fri-Jan-2018-03-48-59.png)
Needless to say, the location of the street main or of the septic tank in relation to the house is going to determine at what point the sewer soil- pipe enters the house. The soil pipe passes through the wall of the bathroom that was framed with 2" x 6" instead of 2" x 4" studding to allow for the size of the hub on the soil pipe.
![plumbing floor plan water cad plumbing floor plan water cad](https://i.pinimg.com/originals/43/28/6b/43286b1cfd929e182a21b87c5eaa90eb.png)
When a stud or, especially, a floor joist or ceiling joist must be cut back a little to allow a pipe to pass through it, this member should be reinforced either with a metal strap across the opening or studding nailed to the sides.Īlong with the openings for the waste lines to the fixtures, you will also need openings in the floor for the soil-pipe stack. Be sure that you position the holes in such a fashion that you do not come directly over a floor joist. In fact, in installing both the plumbing and heating systems, care must be taken to cut away as little of the joists and studding as possible. Holes can be made by first drilling through the flooring with a brace and bit and then expanding the opening with a keyhole saw. Layout for connections to the soil stack. This is a section of Chapter 13 of BUILD YOUR DREAM HOME at Inspect - online encyclopedia of building & environmental inspection, testing, diagnosis, repair, & problem prevention advice.įig. If your first floor is made of wood, the first thing you should do is to make the openings in the floor of the bathroom and kitchen so that waste lines to the fixtures can be brought in. You can get these measurements from your dealer when the fixtures are purchased. These roughing plans (plumbing rough-in plans) will give you all the dimensions of the fixtures, their minimum height from the floor and distance from the wall, and the location of the holes in the wall and floor for the supply lines and waste pipes. Layout for the fresh-water supply system. Installing the Plumbing Systemīefore you can do much in the way of getting the plumbing system installed, you must obtain the roughing in measurements for the type of fixtures that you are going to install.įig.
![plumbing floor plan water cad plumbing floor plan water cad](https://thumb.cadbull.com/img/product_img/original/hydraulic_water_system_for_school_cad_drawing_details_dwg_file_08072019103425.jpg)
We also provide an ARTICLE INDEX for this topic, or you can try the page top or bottom SEARCH BOX as a quick way to find information you need. New York, 1950.įrom site selection and obtaining financing through each step in construction of a single family home the simple procedures and drawings in this book are still useful for anyone building or repairing a home or other small structure.
#Plumbing floor plan water cad series#
This article series provides an updated version of Hubbard Cobb's Your Dream Home, illustrated by Sigman-Ward, first published by Wm. We have no relationship with advertisers, products, or services discussed at this website. InspectAPedia tolerates no conflicts of interest.